# How Many Jobs Do Data Centers Create? Statistics 2026: Jobs per Site

A typical 250,000-square-foot data center may have approximately **50** full-time workers, about half of which are contract workers, according to Virginia’s Joint Legislative Audit and Review Commission (JLARC). At the height of construction, approximately **1,500** workers are on site, data center representatives indicated.

Industry-wide, a PwC study for the Data Center Coalition says the US data center industry directly employed **1,005,080** people in 2024, and its total annual employment contribution reached **5.5 million** jobs. The two figures measure different things: one building’s workforce, about half of it contract workers, and an industry total built with multipliers that spans everything up to the [largest data centers in the US](https://tricitylocalnews.com/largest-data-centers-us/).

## Key Takeaways

- Figures data center representatives gave JLARC put about **30** construction workers on site at peak for every full-time worker at a typical building.
- Employment in computing infrastructure providers, data processing, web hosting, and related services was **453,800** in September 2026 (preliminary), down from **489,200** in August 2023.
- Meta says its **1 gigawatt** El Paso campus will support **300** operational jobs once complete.
- Brookings researchers estimate roughly **100-200** jobs at a typical treated county, depending on facility type.
- In PwC’s latest study, each direct job in the data center industry supports more than **4.5** jobs elsewhere; its earlier study said more than six.
- Good Jobs First says taxpayer costs routinely exceed **$1 million** per permanent job.

## Editor’s Choice

- Direct industry jobs: **1,005,080** people directly employed by the US data center industry in 2024, per PwC for the Data Center Coalition.
- Total jobs supported: **5.5 million** jobs, alongside **$926.9 billion** in GDP in 2024.
- Tax contributions: **$204.4 billion** to federal, state, and local governments.
- Peak construction at Richland Parish: **7,500+** skilled trade workers on-site at peak construction in Louisiana, per Meta.
- States not publishing losses in a timely way: **14** of the **37** states with sales and use tax exemptions for data centers.
- Projected hosting job growth: **19.5%**, or **95,400** jobs, for computing infrastructure providers, data processing, web hosting, and related services.

## How Many Jobs Do Data Centers Create

- Construction of an individual data center building usually takes about **12 to 18** months.
- The data center industry is estimated to contribute **74,000** jobs, **$5.5 billion** in labor income and **$9.1 billion** in GDP to Virginia’s economy annually, JLARC found.
- Most of those economic benefits derive from the construction phase rather than data centers’ ongoing operations.
- Critics, as summarized by Brookings researchers, note that large data center projects often promise only dozens to a few hundred permanent workers while the associated construction jobs are temporary.
- Estimates for a typical treated county range from roughly **100-200** jobs, depending on facility type.
- Capacity and spending totals for the same facilities sit in the wider [data center capacity and capex figures](https://tricitylocalnews.com/data-center-statistics/).

| Count | What it measures | Figure | Source |
|---|---|---|---|
| Typical building staff | Full-time workers at a 250,000-square-foot data center, about half contract | approximately 50 | JLARC |
| Peak construction crew | Workers on site at the height of construction | approximately 1,500 | JLARC |
| Typical county gain | Jobs at a typical county receiving a first large data center | roughly 100-200 | Brookings |
| Federal industry count | All employees, NAICS 518, September 2026 (preliminary) | 453,800 | BLS |
| Industry direct jobs | People directly employed by the US data center industry, 2024 | 1,005,080 | PwC for the Data Center Coalition |
| Industry total jobs | Total annual employment contribution, 2024 | 5.5 million | PwC for the Data Center Coalition |
| Single campus pledge | Operational jobs at Meta’s El Paso campus once complete | 300 | Meta |

*Source: JLARC, Brookings Institution, US Bureau of Labor Statistics, PwC for the Data Center Coalition, Meta, 2024 to 2026*

### About This Data

- Compiled from 23 sources: 5 federal and state statistics and audits, 7 company announcements, 10 industry, research and advocacy reports, and 1 news commentary.
- Sources date from July 2023 to October 2026.
- Government, company and independent research data came first; paid market-research reports were excluded.
- Figures are reviewed on a rolling basis and updated when sources publish new editions.

### How many people work in a data center?

A typical 250,000-square-foot data center may have approximately **50** full-time workers, and approximately **1,500** workers are on site at the height of construction, JLARC reported. Industry-wide, PwC’s study for the Data Center Coalition counts **1,005,080** direct jobs in 2024 and a total employment contribution of **5.5 million** jobs.

## Data Center Industry Employment by Year

- BLS counted **453,800** employees in computing infrastructure providers, data processing, web hosting, and related services in September 2026, a preliminary figure, against **455,400** in August 2026.
- Employment is now about **7.2%** below its August 2023 level of **489,200**.
- The series stood at **308,300** in September 2016.
- Employment rose from **420,400** in September 2021 to **479,100** in September 2022.
- The figures are seasonally adjusted, and August and September 2026 are marked preliminary.

 EMPLOYEES · Source: US Bureau of Labor Statistics, Current Employment Statistics, September 2026   EMPLOYEES    US Bureau of Labor Statistics · 2026 Data Processing and Hosting Employment (Jobs)          500K 375K 250K 125K 0   349,100 2019  357,500 2020  420,400 2021  479,100 2022  485,300 2023  481,500 2024  476,300 2025  453,800 2026 (preliminary)    SOURCE US Bureau of Labor Statistics, Current Employment Statistics, September 2026    View the data| September of year | Jobs |
|---|---|
| 2019 | 349,100 |
| 2020 | 357,500 |
| 2021 | 420,400 |
| 2022 | 479,100 |
| 2023 | 485,300 |
| 2024 | 481,500 |
| 2025 | 476,300 |
| 2026 (preliminary) | 453,800 |





> **Worth noting:** The BLS series covers computing infrastructure providers, data processing, web hosting, and related services, a category wider than data center staff alone. It has drifted lower while construction hiring climbed. Nonresidential construction employment increased by **16,100** positions in September 2026, according to Associated Builders and Contractors.

## Recent Developments

- **October 2, 2026:** The construction industry added **11,000** jobs on net in September 2026, and industry employment is up **109,000** jobs, or **1.3%**, year over year, ABC said. ABC Chief Economist Anirban Basu tied the gains to the data center boom supporting rapid hiring of certain specialty trade contractors.
- **September 15, 2026:** Roughly **1 in 6** ABC members is currently under contract to work on a data center, the highest proportion on record, and contractors with data center work reported **9.9** months of backlog against **8.3** months for those without.
- **August 18, 2026:** Amazon raised its Louisiana data center investment plan from **$12 billion** to **$18 billion**, with three planned campuses expected to create up to **750** full-time data center jobs and support **2,500** additional positions.
- **August 10, 2026:** Brookings researchers updated their data center employment brief to reflect new results as the research continues with an expanded sample.
- **July 28, 2026:** Meta said over **2,300** workers are already onsite at its El Paso campus, which expects to begin bringing capacity online in 2028.
- **July 28, 2026:** In Uptime Institute’s 2026 global survey, more than half of all respondents report difficulties finding qualified candidates for open positions, based on responses from more than **800** data center owners and operators.

## Construction Jobs vs Permanent Jobs at Data Centers

- At the height of construction, approximately **1,500** workers are on site from various construction-related industries, about **30** for each full-time worker at a typical building.
- Georgia’s tax evaluation attributes **8,505** construction jobs and **1,641** operations jobs to the state’s tax exemption, about **5.2** construction jobs per operations job.
- Meta’s El Paso campus is supporting more than **4,000** construction jobs at peak and **300** operational jobs once complete.
- On its Richland Parish project page, Meta says each data center building requires thousands of skilled trade labor jobs to construct, while JLARC’s peak count describes a typical 250,000-square-foot building.

| Project or scope | Construction jobs or peak workers | Permanent or operations jobs | Source |
|---|---|---|---|
| Typical 250,000-square-foot building | approximately 1,500 | approximately 50 | JLARC |
| Meta Richland Parish, Louisiana | 7,500+ | 1,000 | Meta |
| Meta El Paso, Texas | more than 4,000 | 300 | Meta |
| Georgia, jobs attributed to the exemption (statewide) | 8,505 | 1,641 | Georgia Department of Audits and Accounts |

*Source: JLARC, Meta, Georgia Department of Audits and Accounts, 2024 to 2026*

### Nonresidential Construction Hiring, September 2026

- Nonresidential specialty trade added the most jobs in September 2026, growing by **12,300** positions.
- The construction unemployment rate was **3.5%** in September 2026.
- The residential segment has shed **1.0%** of its employment base over the past year, Basu said.

 JOBS ADDED · Source: Associated Builders and Contractors analysis of BLS data, October 2026   JOBS ADDED    Associated Builders · 2026 Nonresidential Construction Jobs Added, September 2026 (jobs)         Nonresidential specialty trade  12,300 Heavy and civil engineering  2,600 Nonresidential building  1,200  0 3K 6K 9K 12K 15K   SOURCE Associated Builders and Contractors analysis of BLS data, October 2026    View the data| Subcategory | Jobs |
|---|---|
| Nonresidential specialty trade | 12,300 |
| Heavy and civil engineering | 2,600 |
| Nonresidential building | 1,200 |





Specialty trade hiring of this kind follows [data center construction spending](https://tricitylocalnews.com/data-center-construction-statistics/) rather than the size of any operating staff.

### Do data centers create permanent jobs?

A typical 250,000-square-foot data center may have approximately **50** full-time workers, about half of which are contract workers, [JLARC reported](https://jlarc.virginia.gov/pdfs/reports/Rpt598.pdf). Georgia’s evaluation attributes **1,641** operations jobs to its exemption, against **8,505** construction jobs. Construction jobs end when a building is finished.

## Data Center Jobs per Gigawatt and per Dollar Invested

- Meta’s El Paso campus will have **1 gigawatt** of compute capacity and represents an investment of over **$10 billion**, so its operational jobs work out to fewer than **30** per **$1 billion** invested.
- The Richland Parish Data Center will deliver over two gigawatts of compute capacity, so its announced operational jobs work out to fewer than **500** per gigawatt. The [data center energy consumption figures](https://tricitylocalnews.com/data-center-energy-consumption-statistics/) show what that much capacity draws from the grid.
- Amazon plans to invest at least **$20 billion** in Pennsylvania to expand its data center infrastructure, creating **1,250** new high-skilled jobs.
- Amazon’s **$10 billion** North Carolina plan works out to **50** new jobs per **$1 billion**.
- Amazon says its Warren County campus is estimated to create at least **200** new jobs at the Amazon data center campus.
- Amazon has invested over **$156 billion** in US data center infrastructure since 2011, supporting more than **37,000** jobs annually.
- Meta says the El Paso campus will play an essential role in bringing its AI technologies to life. The same per-gigawatt arithmetic applies to other [AI data center campuses](https://tricitylocalnews.com/ai-data-centers/).

 ANNOUNCED PERMANENT JOBS · Source: Meta, Amazon, 2025 to 2026   ANNOUNCED PERMANENT JOBS    Meta · 2025 to 2026 Announced Permanent Jobs by Data Center Project (jobs)         Amazon Pennsylvania  1,250 Meta Richland Parish, Louisiana  1,000 Amazon North Carolina  500 Meta El Paso, Texas  300  0 300 600 900 1.2K 1.5K   SOURCE Meta, Amazon, 2025 to 2026    View the data| Project | Jobs |
|---|---|
| Amazon Pennsylvania | 1,250 |
| Meta Richland Parish, Louisiana | 1,000 |
| Amazon North Carolina | 500 |
| Meta El Paso, Texas | 300 |





> **By the numbers:** Meta’s El Paso campus pairs **1 gigawatt** of compute capacity with **300** operational jobs. Amazon’s North Carolina plan puts **$10 billion** behind **500** new high-skilled jobs, about **$20 million** of planned investment per announced job. That ratio is why per-job subsidy math runs high.

## Data Center Economic Impact: Industry Estimates

- The Data Center Coalition engaged independent consultant PwC to quantify the economic contributions of the US data center industry between 2023 and 2024. Because an industry group commissioned the work, its totals read as the industry’s own estimate.
- Total annual employment contribution reached **5.5 million** jobs in 2024, a **17%** increase on 2023.
- Total annual contribution to US GDP grew from **$768 billion** in 2023 to **$927 billion** in 2024, a **21%** increase.
- Total fiscal support to federal, state, and local governments increased from **$165 billion** in 2023 to **$204 billion** in 2024, a **24%** increase, and amounted to **$369 billion** over the two years.
- From 2017 to 2023, direct employment in the US data center industry grew by over **50%**, compared to **10%** growth in employment for the United States overall.
- Total annual employment contribution rose **60%** from 2017 to 2023, in PwC’s earlier study.

 TOTAL JOBS SUPPORTED · Source: PwC for the Data Center Coalition, 2025 and 2026 studies   TOTAL JOBS SUPPORTED    PwC · 2025 to 2026 US Jobs Supported by Data Centers (Millions)          6 4.5 3 1.5 0   2.9 2017  4.7 2023  5.5 2024    SOURCE PwC for the Data Center Coalition, 2025 and 2026 studies    View the data| Year | Millions |
|---|---|
| 2017 | 2.9 |
| 2023 | 4.7 |
| 2024 | 5.5 |





Facility-level counts, such as the [hyperscale data center figures](https://tricitylocalnews.com/hyperscale-data-center-statistics/), are a separate measure from these industry totals.

## Why Industry and Critic Job Counts Differ

- PwC says the US data center industry directly employed **1,005,080** people in 2024, while the BLS count for computing infrastructure, data processing and web hosting was **481,300** in August 2024.
- Neither figure corrects the other: PwC applies its own definition of the data center industry, while BLS counts employees of one industry code.
- PwC’s earlier study put the industry’s 2023 contribution to US GDP at **$727 billion**; the latest puts 2023 at **$768 billion**.
- Brookings researchers say a naive comparison of treated and control counties, as some industry-sponsored reports have done, would overstate the impact on jobs, because data center counties were growing faster before the facilities arrived.
- An independent researcher writing in Cardinal News notes that to claim Virginia’s sales tax exemption a data center must invest **$150 million** and create **50** jobs at **150%** of the local average wage, with lower thresholds in distressed localities. Fifty is also the per-building figure several data center representatives gave JLARC.

| Measure | PwC earlier study (2017 to 2023) | PwC latest study (2023 to 2024) |
|---|---|---|
| 2023 contribution to US GDP | $727 billion | $768 billion |
| 2023 fiscal support to governments | $162.7 billion | $165 billion |
| Jobs supported elsewhere per direct job | more than six | more than 4.5 |

*Source: PwC for the Data Center Coalition, 2025 and 2026 studies*

> **Key finding:** Brookings researchers assembled a dataset of approximately **1,500** US data center facilities along with **52** announced-but-canceled projects, and compare labor markets with built facilities to labor markets with announced-but-canceled facilities. That design separates what a data center adds from growth a county was already on track for.

## Local Employment Effects of Data Centers

- Labor markets that receive their first large data center see employment rise in the data processing sector by **56%** over the first decade of operations.
- Telecommunications, a key sector in data center operations, jumps **43%**, while wages were unchanged and home prices rose a modest **2% to 5%**.
- At a typical treated county, these estimates imply roughly **100-200** jobs, depending on facility type.
- The estimates link facilities to county-level employment and wage data from the Bureau of Labor Statistics for 2003-2024.
- The telecommunications ecosystem effects are concentrated in hyperscale investment, while colocation facilities generate construction activity and modest operational employment.
- Location decisions for hyperscale facilities are driven by power availability, land, and fiber infrastructure, not by tax breaks.
- In hyperscale counties, incentives represent about **2%** of total construction investment, against **62%** in colocation counties.

### Do data centers bring jobs to local communities?

Yes, with caveats. Labor markets that receive their first large data center see data processing employment rise **56%** over the first decade, and the estimates imply roughly **100-200** jobs at a typical treated county, Brookings researchers found. Wages were unchanged, and home prices rose a modest **2% to 5%**.

## Data Center Tax Breaks: Cost per Job

- An earlier 2016 report profiled **11** subsidized data centers and found total support averaging **$1.95 million** per job, Good Jobs First says.
- Subsidized companies have invested upwards of **$5.4 billion** in Illinois server farms, and state and local governments have spent roughly **$1.4 million** per new data center job.
- Of Illinois’s grants, **$91.5 million** has gone to Microsoft for three data centers in the Chicago suburbs.
- Data center companies routinely stack subsidies, collecting sales tax exemptions, property tax abatements, and income tax credits simultaneously.
- Georgia’s evaluation determined that **30%** of data centers in Georgia could be attributed to the tax exemption, so **70%** would exist in its absence. That attribution share drives every per-job figure for [Georgia’s data center tax exemption](https://tricitylocalnews.com/data-centers-in-georgia/).

| Case | Subsidy | Jobs | Cost per job | Source |
|---|---|---|---|---|
| Columbus, Ohio property tax abatement (2021) | $54.3 million | 20 | $2.7 million | Good Jobs First |
| Illinois data center program (since mid-2019) | $468 million | 339 | roughly $1.4 million | Good Jobs First |
| Georgia sales and use tax exemption (FY 2025) | $474.2 million forgone | 8,505 construction, 1,641 operations | $42,646 | Georgia Department of Audits and Accounts |

*Source: Good Jobs First (2023), Georgia Department of Audits and Accounts (2025)*

> **Why it matters:** Good Jobs First says all of these subsidies favor capital investment, not job creation, such that taxpayer costs routinely exceed **$1 million** per permanent job. For a county weighing an abatement, the operating headcount is the job count that lasts.

### How much do data center tax breaks cost per job?

Good Jobs First reports that state and local governments have collectively spent roughly **$1.4 million** per new data center job in Illinois, and a 2021 Columbus abatement equaled **$2.7 million** for each of the center’s **20** jobs. Georgia’s evaluation uses a different method and reports a far lower figure.

## State Revenue Lost to Data Center Tax Exemptions

- **14** of the **37** states with sales and use tax exemptions for data centers do not publish their official revenue losses in a timely way, Good Jobs First found.
- An earlier Good Jobs First count, from April 2025, found that of the **32** states with tax incentives to data centers, **12** fail to disclose even aggregate revenue losses.
- At least **10** states already lose more than **$100 million** per year in tax revenue to data centers.
- Texas revised its FY 2025 cost projection from **$130 million** to **$1 billion** in the space of just **23** months, and now projects **$1.3 billion** for FY 2026. That revision shows how quickly [Texas data center incentives](https://tricitylocalnews.com/data-centers-in-texas/) outran early estimates.
- Brookings researchers cite an estimated **$1.6 billion** cost for Virginia’s data-center sales-tax exemption in fiscal year 2025. The higher figure in the table below adds local government losses, and the [Virginia data center tax exemption figures](https://tricitylocalnews.com/data-centers-in-virginia/) set out each estimate.
- In just two years, more than **83%** of Indiana’s data center sales and use tax exemption went to Amazon.com.
- Wisconsin’s Legislative Fiscal Bureau projected that if four data center projects are built as planned, the state will lose **$1.5 billion** during construction and **$269 million** annually going forward.

| State | Figure | Period | What it is |
|---|---|---|---|
| Georgia | $2.5 billion | FY 2026 | Cost projection, raised 664% in January 2026 |
| Virginia | $1.94 billion | FY 2025 | State and local cost of the sales and use tax break |
| Ohio | $1.6 billion | 2025 | State loss, excluding local sales tax shares |
| Texas | $1.3 billion | FY 2026 | Projected loss |
| Indiana | $655 million | As of 2025 | Reported loss to the sales and use tax exemption |
| Oregon | $616 million | 2016 to 2025 | Property tax abatements for Amazon, Apple, Alphabet and Meta data centers |

*Source: Good Jobs First, June 2026*

The rows cover different years, taxes and bases, so they are never added together. Yearly detail on the [Ohio data center tax break](https://tricitylocalnews.com/data-centers-in-ohio/) shows how fast one state’s figure moved.

## Data Center Job Growth Outlook

- BLS projects employment in computing infrastructure providers, data processing, web hosting, and related services to grow **19.5%**, or **95,400** jobs, from 2023 to 2033.
- Software publishers are projected to grow **20.4%**.
- The hosting industry’s projected rate is about **4.6 times** the rate projected for total wage and salary employment.
- The monthly BLS series has moved the other way since August 2023, so the projection and the recent count do not yet line up.

 PROJECTED EMPLOYMENT CHANGE · 2023 to 2033 · Source: US Bureau of Labor Statistics, Monthly Labor Review, 2024   PROJECTED EMPLOYMENT CHANGE    US Bureau of Labor Statistics · 2024 Projected Employment Change by Information Industry (%) 2023 to 2033         Software publishers  20.4% Computing infrastructure, data processing and web hosting  19.5% Web search portals, libraries and archives  17.4% Media streaming, social networks and content providers  5.8% Total wage and salary employment  4.2% Telecommunications  -7.7%  -10 0 10 20 30   SOURCE US Bureau of Labor Statistics, Monthly Labor Review, 2024    View the data| Industry | Value (%) |
|---|---|
| Software publishers | 20.4% |
| Computing infrastructure, data processing and web hosting | 19.5% |
| Web search portals, libraries and archives | 17.4% |
| Media streaming, social networks and content providers | 5.8% |
| Total wage and salary employment | 4.2% |
| Telecommunications | -7.7% |





## Data Center Occupations and Wages

- In 2025, the industry code employed **24,940** computer support specialists, [BLS industry data](https://www.bls.gov/iag/tgs/iag518.htm) show.
- Amazon says opportunities at its Warren County campus include data center engineers, network specialists, operations managers, and security specialists.
- Meta says construction trades on its Louisiana project include steel workers, pipefitters, electricians, carpenters and fiber technicians.
- JLARC found that data center jobs tend to be high paying.

 EMPLOYMENT IN NAICS 518, 2025 · Source: US Bureau of Labor Statistics, Occupational Employment and Wage Statistics, 2025   EMPLOYMENT IN NAICS 518, 2025    US Bureau of Labor Statistics · 2025 Selected Occupations in Data Processing and Hosting (jobs)         Computer support specialists  24,940 Computer systems analysts  14,540 Computer programmers  2,630  0 5K 10K 15K 20K 25K   SOURCE US Bureau of Labor Statistics, Occupational Employment and Wage Statistics, 2025    View the data| Occupation | Jobs |
|---|---|
| Computer support specialists | 24,940 |
| Computer systems analysts | 14,540 |
| Computer programmers | 2,630 |





- Average hourly earnings of all employees in the industry code were **$60.78** in August 2026, a preliminary figure, up from **$59.88** in May 2026.

 AVERAGE HOURLY EARNINGS · Source: US Bureau of Labor Statistics, Current Employment Statistics, August 2026   AVERAGE HOURLY EARNINGS    US Bureau of Labor Statistics · 2026 Average Hourly Earnings in Data Processing and Hosting, 2026 ($)          80 60 40 20 0   $59.88 May  $59.63 June  $60.26 July  $60.78 August (preliminary)    SOURCE US Bureau of Labor Statistics, Current Employment Statistics, August 2026    View the data| Month, 2026 | Value ($) |
|---|---|
| May | $59.88 |
| June | $59.63 |
| July | $60.26 |
| August (preliminary) | $60.78 |





### What jobs are there in a data center?

Operations jobs center on electrical, mechanical and IT work. Meta says once operational, the Richland Parish data center will support **1,000** operational jobs: electricians, HVAC specialists, server and network techs and engineers. BLS counts **14,540** computer systems analysts and **2,630** computer programmers in the same industry code.

## Conclusion

A typical 250,000-square-foot data center may have approximately **50** full-time workers, about half of which are contract workers, while PwC’s study for the Data Center Coalition credits the industry with **5.5 million** jobs in total. The first is one building’s workforce, contractors included; the second adds jobs elsewhere through a multiplier that changed between editions.

For a county weighing an incentive, the lasting figure is the operating headcount. The next readings to watch are the monthly BLS series and the cost figures states have yet to publish.