# Data Center Water Usage Statistics 2026: Campus and AI Water Use

Pacific Institute research on data center water usage found that a single facility can withdraw from a daily average of **270 gallons** to **3.9 million gallons**. For a typical facility, **74%** of the water withdrawn is consumed. Google’s 2025 location table lists its Council Bluffs, IA campus at **1,746.4 million gallons** withdrawn. Microsoft’s total water withdrawal reached **13,266 megaliters** (ML) in FY25, up from **6,794 ML** in FY20.

Withdrawal, discharge and consumption are three different measures, and each source reports its own. Campus figures for Google and Microsoft follow, then water sources, efficiency, water stress, AI prompts and state planning. National totals sit with the [data center energy and water figures](https://tricitylocalnews.com/data-center-energy-consumption-statistics/).

## Key Takeaways

- Across **65** data centers, the Pacific Institute found a median withdrawal of **44.3 million gallons** a year against an average of **159 million gallons**.
- A typical facility consumed **74%** of the water it withdrew, while the overall average was **59%**.
- Google’s Council Bluffs, IA campus withdrew about **39 times** the Pacific Institute’s median facility.
- Microsoft consumed **8,170 ML** of the **13,266 ML** it withdrew in FY25, about **62%**.
- **13%** of Google’s 2025 freshwater withdrawal came from sources at high risk of water depletion or scarcity.
- Only **17%** of data centers responded to the Texas Water Development Board, out of **341** surveys sent this year.

## Editor’s Choice

- Google Council Bluffs withdrawal: **1,746.4 million gallons** in 2025.
- Microsoft Quincy withdrawal: **1,292 ML** in FY25.
- Google data center withdrawal: **13,562 million gallons** in 2025, with **3,039 million** discharged.
- AWS water use effectiveness: **0.12 liters** of water withdrawn per kilowatt-hour of IT load.
- Water per Gemini prompt: **0.26 milliliters** for the median Gemini Apps text prompt.
- Peak vs average demand: peak daily water demand of **3 to 30 times** the average.

## Data Center Water Usage per Facility

- Across **65** data centers, water withdrawals ranged from **100,000 gallons** to **1.4 billion gallons** per year, or **270 gallons** to **3.9 million gallons** per day.
- Withdrawals for a typical facility, as represented by the median, were **44.3 million gallons** per year (**121,000 gallons** per day).
- The average was much higher at **159 million gallons** per year (**436,000 gallons** per day) because a small number of facilities withdrew exceptionally large volumes.
- The average facility withdrew about **3.6 times** the median.
- Peak daily water demand at data centers can range from **3 to 30 times** the average, against hospital peaking factors typically below **3**.

| Measure | Average | Median | Minimum | Maximum | Sample size |
|---|---|---|---|---|---|
| Annual withdrawal (million gallons) | 159 | 44.3 | 0.10 | 1,410 | 65 |
| Annual consumption (million gallons) | 123 | 32.1 | 0.01 | 1,010 | 65 |
| Annual discharge (million gallons) | 56.1 | 22.6 | 0.10 | 400 | 36 |
| Estimated daily withdrawal (million gallons) | 0.436 | 0.121 | 0.00 | 3.86 | 65 |
| Consumptive ratio (unitless) | 0.59 | 0.74 | 0.10 | 0.94 | 36 |

*Source: Pacific Institute, 2026*

### About This Data

- Compiled from 15 source documents: 8 company reports and pages from Google, Microsoft, Amazon and Meta, 2 federal publications, 4 research publications and 1 advocacy testimony.
- Publication dates run from December 2024 to September 2026.
- Paid market-research reports were excluded, and units stay as each source reports them.
- Figures are reviewed on a rolling basis and updated when sources publish new editions.

### How much water do data centers use?

A typical data center withdrew **44.3 million gallons** of water a year, about **121,000 gallons** a day, across the **65** facilities in the Pacific Institute’s study. The average was **159 million gallons** because a small number of facilities withdrew exceptionally large volumes.

## Google Data Center Withdrawal at Selected Campuses

- Google’s Council Bluffs, IA campus withdrew **1,746.4 million gallons** in 2025, discharged **400.4 million** and consumed an estimated **1,346.0 million**.
- Council Bluffs withdrew about **39 times** the Pacific Institute’s median facility of **44.3 million gallons**.
- Council Bluffs, Mayes County and New Albany together held about **31%** of Google’s data center withdrawal.
- Douglas County, GA drew **394.3 million gallons** of its **440.6 million** from reclaimed wastewater.
- Midlothian, TX withdrew **263.6 million gallons** and Red Oak, TX **67.0 million**, while Phoenix, AZ withdrew **0.5 million gallons**.
- Ashburn, VA withdrew **76.5 million gallons**, and Bristow, VA withdrew **359.6 million**.

 WITHDRAWAL · Source: Google, 2026 report (selected campuses)   WITHDRAWAL    Google · 2026 Google Water Withdrawal by Campus, 2025 (Million Gallons)         Council Bluffs, IA  1,746.4 Mayes County, OK  1,396.7 New Albany, OH  1,008.1 Berkeley County, SC  988.5 Papillion, NE  677.8 The Dalles, OR  654.3 Douglas County, GA  440.6 Henderson, NV  401.7  0 400 800 1.2K 1.6K 2K   SOURCE Google, 2026 report (selected campuses)    View the data| Campus | Million Gallons |
|---|---|
| Council Bluffs, IA | 1,746.4 |
| Mayes County, OK | 1,396.7 |
| New Albany, OH | 1,008.1 |
| Berkeley County, SC | 988.5 |
| Papillion, NE | 677.8 |
| The Dalles, OR | 654.3 |
| Douglas County, GA | 440.6 |
| Henderson, NV | 401.7 |





### Which Google data center uses the most water?

Of the Google campuses in the table above, Council Bluffs, IA withdrew the most water. Council Bluffs, IA withdrew **1,746.4 million gallons**, against **1,396.7 million** at Mayes County, OK and **1,008.1 million** at New Albany, OH. Google reports these figures by location, and the [hyperscale data center statistics](https://tricitylocalnews.com/hyperscale-data-center-statistics/) show how many such campuses now operate.

## Recent Developments

- **September 30, 2026:** Amazon and Microsoft announced a water replenishment project in Hesse, Germany, expected to return more than **750 million liters** of water annually to the local groundwater supply once completed.
- **September 2026:** An issue brief from the Pacific Institute found withdrawals ranging from **100,000 gallons** to **1.4 billion gallons** per year across **65** data centers.
- **September 1, 2026:** Public Citizen’s testimony said that of the **341** surveys the Texas Water Development Board sent this year, only **17%** of the data centers responded.
- **August 31, 2026:** HARC put current New Mexico data centers at **502 Mgal/yr** of total water use, and planned sites at **16 Bgal/yr**.
- **July 2026:** AWS reported a water use effectiveness of **0.12** for 2025, a **20%** drop year over year.

## Google Water Withdrawal by Year

- Google’s global operational water withdrawal rose from **6,297 million gallons** in 2021 to **14,689 million gallons** in 2025.
- The 2025 total was about **2.3 times** the 2021 level.
- Data centers accounted for about **92%** of Google’s 2025 withdrawal.
- Offices and other facilities withdrew **1,127 million gallons** in 2025 and discharged **781 million**.
- Company-wide discharge rose from **1,735 million gallons** in 2021 to **3,820 million** in 2025.

 WITHDRAWAL · Source: Google, 2021 to 2025   WITHDRAWAL    Google · 2021 to 2025 Google Global Water Withdrawal by Year (Million Gallons)          15K 11.2K 7.5K 3.8K 0   6,297 2021  7,600 2022  8,653 2023  11,011 2024  14,689 2025    SOURCE Google, 2021 to 2025    View the data| Year | Million Gallons |
|---|---|
| 2021 | 6,297 |
| 2022 | 7,600 |
| 2023 | 8,653 |
| 2024 | 11,011 |
| 2025 | 14,689 |





## Microsoft Datacenter Withdrawal by Site

- Microsoft’s Quincy (WA) datacenter withdrew **1,292 ML** in FY25 and used **1,381,569 MWh** of electricity.
- Phoenix (AZ) withdrew **981 ML** and recorded **2,675 ML** of water replenishment.
- Phoenix’s replenishment was about **2.7 times** its FY25 withdrawal.
- Atlanta (GA) withdrew **19 ML**, and Manassas (VA) **11 ML**.
- The figures cover Microsoft-owned datacenters for the fiscal year ended **June 30, 2025**.

 WITHDRAWAL, FY25 · Source: Microsoft, FY25   WITHDRAWAL, FY25    Microsoft Microsoft Water Withdrawal by Location, FY25 (ML)         Quincy (WA)  1,292 Phoenix (AZ)  981 San Antonio (TX)  420 Boydton (VA)  362 Des Moines (IA)  264 Ashburn (VA)  239 Chicago (IL)  204 Cheyenne (WY)  188  0 300 600 900 1.2K 1.5K   SOURCE Microsoft, FY25    View the data| Location | Value (ML) |
|---|---|
| Quincy (WA) | 1,292 |
| Phoenix (AZ) | 981 |
| San Antonio (TX) | 420 |
| Boydton (VA) | 362 |
| Des Moines (IA) | 264 |
| Ashburn (VA) | 239 |
| Chicago (IL) | 204 |
| Cheyenne (WY) | 188 |





> **By the numbers:** Microsoft’s Quincy (WA) datacenter withdrew **1,292 ML** in FY25, Phoenix (AZ) **981 ML** and San Antonio (TX) **420 ML**. Boydton (VA) withdrew **362 ML** and Des Moines (IA) **264 ML**, and the table covers Microsoft-owned datacenters for the fiscal year ended **June 30, 2025**.

Phoenix’s water ledger belongs to the wider record of [data centers in Arizona](https://tricitylocalnews.com/data-centers-in-arizona/), while Boydton and Ashburn sit inside the [data centers in Virginia](https://tricitylocalnews.com/data-centers-in-virginia/) cluster.

## Microsoft Water Withdrawal by Region

- North America accounted for **7,366 ML** of Microsoft’s **13,266 ML** total water withdrawal in FY25.
- That is about **56%** of the company total.
- Withdrawal in Asia rose from **1,306 ML** in FY20 to **4,082 ML** in FY25.
- Asia’s FY25 withdrawal was about **3.1 times** its FY20 level.
- Third-party sources supplied **8,162 ML** of the **8,170 ML** Microsoft consumed in FY25.
- These regional totals cover Microsoft’s whole operation, offices included, so they are not datacenter-only figures.

 Source: Microsoft, FY20 to FY25     Microsoft Microsoft Water Withdrawal by Region, FY20 to FY25 (ML)            8K 6.4K 4.8K 3.2K 1.6K 0                               North America: 7,366 Asia: 4,082 Europe, Middle East, Africa: 1,692 Latin America: 126    FY20 FY21 FY22 FY23 FY24 FY25    SOURCE Microsoft, FY20 to FY25    View the data| Fiscal year | North America (ML) | Asia (ML) | Europe, Middle East, Africa (ML) | Latin America (ML) |
|---|---|---|---|---|
| FY20 | 4,596 | 1,306 | 869 | 23 |
| FY21 | 5,173 | 1,657 | 869 | 48 |
| FY22 | 5,145 | 2,204 | 1,291 | 58 |
| FY23 | 5,584 | 2,710 | 1,302 | 70 |
| FY24 | 7,002 | 3,370 | 1,197 | 21 |
| FY25 | 7,366 | 4,082 | 1,692 | 126 |







## Data Center Water Withdrawal vs Consumption

- Microsoft’s total water consumption rose from **3,990 ML** in FY20 to **8,170 ML** in FY25, while discharge rose from **2,804 ML** to **5,096 ML**.
- Microsoft consumed about **62%** of the water it withdrew in FY25.
- Microsoft’s FY25 total withdrawal was about **1.95 times** its FY20 level.
- Google’s data centers discharged **3,039 million gallons** in 2025, about **22%** of what they withdrew.

 Source: Microsoft, FY20 to FY25     Microsoft Microsoft Water Withdrawal, Consumption and Discharge (ML)            15K 12K 9K 6K 3K 0                        Withdrawal 13,266 Consumption 8,170 Discharge 5,096    FY20 FY21 FY22 FY23 FY24 FY25    SOURCE Microsoft, FY20 to FY25    View the data| Fiscal year | Withdrawal | Consumption | Discharge |
|---|---|---|---|
| FY20 | 6794 | 3990 | 2804 |
| FY21 | 7747 | 4794 | 2953 |
| FY22 | 8698 | 5329 | 3369 |
| FY23 | 9666 | 5818 | 3848 |
| FY24 | 11,590 | 6693 | 4897 |
| FY25 | 13,266 | 8170 | 5096 |







> **Key finding:** Pacific Institute data show that a typical facility consumed **74%** of the water withdrawn, while the overall average for the data centers was considerably lower at **59%**, a ratio reported for **36** facilities rather than the **65** behind the volume averages. The lower mean reflects a subset of facilities likely using air or once-through cooling systems that consume less of the water withdrawn.

### What is the difference between water withdrawal and water consumption?

Withdrawal is all the water a facility takes in, and consumption is the part that does not go back. For a typical facility, **74%** of the water withdrawn is consumed and unavailable for other uses within the water basin. Microsoft withdrew **13,266 ML** in FY25, consumed **8,170 ML** and discharged **5,096 ML**.

## Where Data Center Water Comes From

- Potable water made up **10,949 million gallons** of the **13,562 million gallons** Google’s data centers withdrew in 2025.
- That is about **81%** potable water.
- Of the estimated **11 billion gallons** withdrawn by the facilities the Pacific Institute evaluated, **76%** was potable water and **24%** came from non-potable sources, including recycled water and seawater.
- AWS already uses recycled water for cooling at **24** data centers and will expand water recycling to more than **120** locations in US states and counties by **2030**.

 WITHDRAWAL · Source: Google, 2025   WITHDRAWAL    Google · 2025 Google Water Withdrawal by Source, 2025 (Million Gallons)         Potable water  10,949 Non-potable water  1,695 Reclaimed wastewater  918  0 3K 6K 9K 12K 15K   SOURCE Google, 2025    View the data| Water source | Million Gallons |
|---|---|
| Potable water | 10,949 |
| Non-potable water | 1,695 |
| Reclaimed wastewater | 918 |





### Do data centers use drinking water?

Municipal drinking water systems were the primary water source for the data centers the Pacific Institute studied, and **76%** of the water withdrawn was potable. At Google, about **81%** of data center withdrawal was potable water. Douglas County, GA ran mostly on reclaimed wastewater, at **394.3 million gallons** of **440.6 million**.

## Data Center Water Use Effectiveness (WUE) by Company

- AWS reported a water use effectiveness (WUE) of **0.12 L/kWh** in 2025, down from **0.25 L/kWh** in 2021 and **20%** lower year over year.
- AWS measures WUE as liters of water withdrawn per kilowatt-hour of IT load (L/kWh).
- Amazon says its **0.12 L/kWh** is **7 times** better than the industry average, which it puts at a withdrawal WUE of **0.84 L/kWh** calculated from a consumption WUE of **0.56 L/kWh**.
- AWS’s WUE fell about **52%** from 2021 to 2025.
- Lawrence Berkeley National Laboratory notes that some hyperscale facilities report WUE values of **0.1-0.3 L/kWh** for similar systems.
- The aggregate median WUE for the hyperscale category in Lawrence Berkeley National Laboratory’s model is **0.32**, or **0.40** if one cooling system had a median WUE of **0.2 L/kWh**.

 WUE (L/KWH) · Source: AWS, 2021 to 2025   WUE (L/KWH)    AWS · 2021 to 2025 AWS Water Use Effectiveness, 2021 to 2025 (L/kWh Withdrawn)          0.25 0.1875 0.125 0.0625 0   0.25 2021  0.19 2022  0.18 2023  0.15 2024  0.12 2025    SOURCE AWS, 2021 to 2025    View the data| Year | L/kWh Withdrawn |
|---|---|
| 2021 | 0.25 |
| 2022 | 0.19 |
| 2023 | 0.18 |
| 2024 | 0.15 |
| 2025 | 0.12 |





A WUE figure only compares with another on the same basis, and each of the [largest data center companies](https://tricitylocalnews.com/largest-data-center-companies/) that publishes one states its own.

### What is a good WUE for a data center?

No single benchmark applies, because WUE is reported on different bases. AWS reports **0.12 L/kWh** on a withdrawal basis, while the aggregate median WUE for hyperscale sites in Lawrence Berkeley National Laboratory’s model is **0.32**, or **0.40** under an alternative cooling assumption of **0.2 L/kWh**.

## Data Centers in Water-Stressed Basins

- **13%** of Google’s 2025 freshwater withdrawal came from sources at high risk of water depletion or scarcity, while **72%** came from sources at low risk.
- Google assigns each data center a low, medium or high water scarcity level by applying its data center Water Risk Framework.
- Meta’s target is to restore **200%** of the water it consumes in high water stress regions and **100%** in medium water stress regions.
- Meta’s operational restoration projects returned over **1.59 billion gallons** of water in 2024.
- AWS was **75%** of the way toward its water positive goal in 2025, up from **53%** in 2024.
- Lawrence Berkeley National Laboratory puts the average water intensity factor for electricity use in the US overall at **4.35 L/kWh**.

 SHARE OF FRESHWATER WITHDRAWAL · Source: Google, 2025    SHARE OF FRESHWATER WITHDRAWAL    Google · 2025 Google Freshwater Withdrawal by Scarcity Risk, 2025 (%)      72% LOW RISK    Low risk 72%    Medium risk 15%    High risk 13%     SOURCE Google, 2025    View the data| Source risk level | Value (%) |
|---|---|
| Low risk | 72% |
| Medium risk | 15% |
| High risk | 13% |





> **Worth noting:** Microsoft’s Phoenix (AZ) datacenter withdrew **981 ML** in FY25 and recorded **2,675 ML** of water replenishment. Amazon counts a NABU wetland project in Hesse, Germany, toward its goal to return more water to communities than it uses in its data center direct operations by **2030**. Replenishment need not happen in the basin the water came from.

## AI Water Footprint per Prompt and Model

- Google estimates the median Gemini Apps text prompt uses **0.24 watt-hours** of energy and consumes **0.26 milliliters** of water, or about five drops.
- A preprint from the University of California, Riverside and UT Arlington estimates that training the GPT-3 language model in Microsoft’s US data centers can directly evaporate **700,000 liters** of clean freshwater.
- [GAO](https://www.gao.gov/assets/gao-25-107172.pdf) found that companies are generally not reporting details of generative AI’s energy and water use, and that estimates of water consumption by generative AI are limited.
- In December 2024, Microsoft said its zero-water-for-cooling datacenter design would avoid the need for more than **125 million liters** of water per year per datacenter.

| Estimate | Value | Estimated by |
|---|---|---|
| Water per median Gemini Apps text prompt, comprehensive method | 0.26 mL | Google |
| Water per median Gemini text prompt, active TPU and GPU only | 0.12 mL | Google |
| Direct evaporation, GPT-3 training in Microsoft US data centers | 700,000 liters | University of California, Riverside and UT Arlington (preprint) |
| Global AI water withdrawal, 2027 projection | 4.2 to 6.6 billion cubic meters | University of California, Riverside and UT Arlington (preprint) |
| Water avoided per datacenter per year, zero-water cooling design | more than 125 million liters | Microsoft |

*Source: Google Cloud 2025, University of California, Riverside 2025, Microsoft 2024*

Training runs belong to the wider [machine learning statistics](https://tricitylocalnews.com/machine-learning-statistics/) on model compute, and the [AI data center build-out](https://tricitylocalnews.com/ai-data-centers/) adds the campuses where that water is drawn.

### How much water does an AI prompt use?

Google estimates a median Gemini text prompt consumes **0.26 mL** of water under its comprehensive methodology and **0.12 mL** when only active TPU and GPU consumption is counted. The gap comes from what each method counts, so a per-prompt figure needs its method attached before it is compared with another company’s.

## State Planning for Data Center Demand

- HARC puts New Mexico data centers at **0.05%** of current water use today and planned sites at **1.6%** of total water use.
- Planned sites would use about **32 times** as much water as New Mexico’s current data centers.
- HARC puts average direct cooling water use at **95 gal/MWh**.
- Public Citizen’s testimony says only one-third of data centers surveyed in **2024** responded to the Texas Water Development Board.
- Only **17%** of the data centers responded to the **341** surveys the Texas Water Development Board sent this year, according to Public Citizen’s testimony.
- HARC estimates that direct and indirect water consumption for existing data centers in Texas totaled as much as **25 billion gallons** in **2025**.
- A mid-size data center can use up to **300,000 gallons** per day for cooling, while a large or hyperscale facility can use up to **5 million gallons** per day, according to Public Citizen’s testimony.

| New Mexico data center water (Mgal = million gallons, Bgal = billion gallons) | Current | Planned sites |
|---|---|---|
| Direct cooling | ~152 Mgal/yr | ~6.3 Bgal/yr |
| Indirect (power plant cooling) | 350 Mgal/yr | 9.7 Bgal/yr |
| Total | 502 Mgal/yr | 16 Bgal/yr |

*Source: HARC, August 2026*

The TWDB five-year plan does not account for individual data center water use in its water plan. That gap leaves planners for the [data centers in Texas](https://tricitylocalnews.com/data-centers-in-texas/) working from partial returns.

## Conclusion

A typical facility consumes **74%** of the water it withdraws, and the Pacific Institute’s median facility withdrew **44.3 million gallons** a year. Google’s Council Bluffs, IA campus withdrew **1,746.4 million gallons**, and Microsoft’s Quincy (WA) datacenter withdrew **1,292 ML**. Read beside the broader [data center statistics](https://tricitylocalnews.com/data-center-statistics/), that spread explains why per-site disclosure says more than a national average.

Planned New Mexico data centers would use **16 Bgal/yr**, against **502 Mgal/yr** today. New sites in the [data center construction pipeline](https://tricitylocalnews.com/data-center-construction-statistics/) will decide how much of that planned figure arrives, and facility-level reporting will matter more to water planners than any new national average.