---
title: "GPU Market Share Statistics 2026: NVIDIA, AMD and H100 Prices"
date: 2026-11-09
author: "Aaron Weiss"
featured_image: "https://tricitylocalnews.com/wp-content/uploads/2026/10/gpu-market-share-statistics-nvidia-amd-h100-prices-v2.jpg"
categories:
  - name: "AI"
    url: "/ai.md"
tags:
  - name: "Statistics"
    url: "/tag/statistics.md"
---

# GPU Market Share Statistics 2026: NVIDIA, AMD and H100 Prices

NVIDIA held **75.97%** of PC video card usage by manufacturer in Valve’s September 2026 Steam Hardware &amp; Software Survey, ahead of AMD at **16.67%** and Intel at **7.01%**. PassMark Software’s count of video cards in use over the last 30 days puts NVIDIA at **55.8%**, AMD at **20.1%** and Intel at **18.5%**. GPU market share therefore depends on what is counted: survey answers or benchmark runs.

In data centers, NVIDIA reported Data Center revenue of **$89.0 billion** for the quarter ended July 26, 2026, up **117%** from a year ago. AMD’s Data Center segment, driven by EPYC processors and Instinct GPUs, reported **$6.7 billion** in the three months ended June 27, 2026, up **107%** year over year. On the rental side, Lambda lists the NVIDIA H100 SXM at **$3.99** per GPU per hour.

## Key Takeaways

- NVIDIA’s share is **20.17 points** higher among Steam survey participants in September 2026 (**75.97%**) than in PassMark’s 30-day count of cards in use (**55.8%**).
- Intel holds **18.5%** of video cards in use in PassMark’s count of the last 30 days, against **7.01%** among Steam survey participants in September 2026.
- Data Center revenue made up **92.5%** of NVIDIA’s **$96.2 billion** total in the quarter ended July 26, 2026.
- AMD’s Data Center business represented **58%** of company revenue in the second quarter of 2026, when total revenue rose **50%** year over year to **$11.5 billion**.
- Jon Peddie Research (JPR) counted **12.5 million** PC graphics add-in boards (AIBs) shipped in Q2 2026, up **10.0%** from the previous quarter and **6.6%** year over year.
- **169** of the **276** accelerated systems on the June 2026 TOP500 list use NVIDIA Hopper or Ampere chips.
- CoreWeave’s spot price for an 8-GPU HGX H100 node is about **40%** of its **$49.24** on-demand hourly rate.

## Editor’s Choice

- NVIDIA fiscal 2026 Data Center revenue: **$193.7 billion**, up **68%** for the full year.
- NVIDIA third-quarter fiscal 2027 outlook: **$108.0 billion** in revenue, plus or minus **2%**, with no Data Center compute revenue from China assumed.
- PC GPUs shipped in Q2 2026: **75.5 million**, integrated and discrete, up **10.4%** quarter-to-quarter.
- GeForce RTX 5070 on Steam, September 2026: **6.15%** of all video cards in the survey.
- Lambda B200 SXM6 rental: **$6.69** per GPU per hour.
- Amazon Web Services (AWS) P5 (H100) price cut: **44%** on On-Demand from the May 31, 2025 baseline.
- CoreWeave HGX B200 node: **$68.80** per hour on-demand.

## GPU Market Share by Vendor

- NVIDIA accounted for **75.97%** of PC video card usage among Steam Hardware &amp; Software Survey participants in September 2026.
- PassMark’s **55.8%** for NVIDIA counts the baselines submitted during the last 30 days, which the company says represents video cards in use rather than purchased.
- NVIDIA leads AMD by **59.3 points** in the Steam survey, against **35.7 points** in PassMark’s count.
- Jon Peddie Research presents AIB market share in a chart and states the quarter-over-quarter changes in its release text.
- Neither Steam nor PassMark counts sales.
- PassMark rounds its shares to one decimal, so its four vendor shares add to **100.1%**.

| Vendor | Steam survey, September 2026 (%) | PassMark, 30 days to October 13, 2026 (%) |
|---|---|---|
| NVIDIA | 75.97 | 55.8 |
| AMD | 16.67 | 20.1 |
| Intel | 7.01 | 18.5 |
| Other | 0.35 | 5.7 |

*Source: Valve (Steam Hardware &amp; Software Survey, September 2026), PassMark Software (October 2026)*

### About This Data

- Compiled from 14 sources: 3 company earnings releases filed with the SEC, 4 Jon Peddie Research releases, 2 Steam survey pages, 1 PassMark benchmark page, the TOP500 list highlights, 2 cloud price lists and 1 AWS price announcement.
- Sources date from June 2025 to October 13, 2026.
- Only company filings and price lists, analyst releases, a user survey, a benchmark database, and the TOP500 list qualified; paid market-research reports were excluded.
- Figures are reviewed on a rolling basis and updated when sources publish new editions.

## NVIDIA Data Center GPU Revenue

- In its [latest quarterly results](https://www.sec.gov/Archives/edgar/data/0001045810/000104581026000073/q2fy27pr.htm), NVIDIA reported revenue of **$96.2 billion** for the quarter ended July 26, 2026, up **18%** from the previous quarter and **106%** from a year ago.
- Revenue in the second quarter of fiscal 2027 was **$96,221 million** (**$96.2 billion**), against **$81,615 million** (**$81.6 billion**) a quarter earlier.
- Data Center revenue was **$89.0 billion**, or **92.5%** of the **$96.2 billion** total, up **18%** from the previous quarter and **117%** from a year ago.
- NVIDIA’s Data Center figure is about **13.3 times** AMD’s **$6.7 billion** Data Center segment, though AMD’s quarter ended a month earlier and its segment includes EPYC CPUs.
- NVIDIA expects third-quarter fiscal 2027 revenue of **$108.0 billion**, plus or minus **2%**, and assumes no Data Center compute revenue from China in that outlook.
- In the fourth quarter of fiscal 2026, ended January 25, 2026, Data Center revenue was a record **$62.3 billion**, up **75%** from a year ago.
- For the full fiscal year 2026, Data Center revenue rose **68%** to a record **$193.7 billion**.
- Edge Computing revenue was **$7.2 billion** in the second quarter, up **27%** from a year ago, which, with Data Center’s **$89.0 billion**, matches the **$96.2 billion** total.
- NVIDIA said its record fourth-quarter Data Center revenue was driven by the major platform shifts to accelerated computing and [AI](/machine-learning-statistics/).

 REVENUE · Source: NVIDIA, second quarter fiscal 2027 results, August 2026   REVENUE    NVIDIA · 2027 NVIDIA Quarterly Revenue ($ millions)         Q2 fiscal 2026  46,743 Q1 fiscal 2027  81,615 Q2 fiscal 2027  96,221  0 20K 40K 60K 80K 100K   SOURCE NVIDIA, second quarter fiscal 2027 results, August 2026    View the data| Quarter | Revenue ($ millions) |
|---|---|
| Q2 fiscal 2026 | 46,743 |
| Q1 fiscal 2027 | 81,615 |
| Q2 fiscal 2027 | 96,221 |





## Recent Developments

- **October 13, 2026:** PassMark’s 30-day count put NVIDIA at **55.8%** of video cards in use.
- **September 2026:** The GeForce RTX 5070 rose **2.38** points to **6.15%** of all video cards in Steam’s survey.
- **September 9, 2026:** JPR reported that AIB shipments were up **10%** from the previous quarter to **12.5 million** units, with the attach rate in desktop PCs at **89%**.
- **August 26, 2026:** NVIDIA said its Vera Rubin platform is ramping into full production, with racks running at partners including CoreWeave, Google Cloud, Microsoft Azure, Oracle Cloud Infrastructure and Nebius.
- **August 4, 2026:** AMD reported second-quarter Data Center segment revenue of **$6.7 billion**, up **107%** year over year.
- **June 2026:** The TOP500 list counted **276** systems using accelerator or co-processor technology, up from **255** six months earlier.

## AMD Data Center Segment Revenue

- AMD’s Data Center segment revenue was **$6.7 billion** (**$6,718 million**) in the three months ended June 27, 2026, up **107%** year over year on demand for EPYC processors and Instinct GPUs.
- Segment revenue for the six months ended June 27, 2026 was up **80.7%** from the six months ended June 28, 2025.
- AMD’s Data Center business represented **58%** of company revenue in the quarter, when total revenue rose **50%** year over year to a record **$11.5 billion**.
- AMD’s year-ago quarter included **$800 million** in inventory and related charges due to the US government’s export control on Instinct MI308 data center GPU products.
- Data Center revenue exceeded AMD’s Client and Gaming segment, which reported **$3.8 billion**: Client business revenue was **$3.1 billion**, up **23%** year over year, while Gaming business revenue fell **31%** year over year to **$779 million** on lower semi-custom revenue.

 DATA CENTER REVENUE · Source: AMD, second quarter 2026 results, August 2026   DATA CENTER REVENUE    AMD · 2026 AMD Data Center Segment Revenue ($ millions)         June 28, 2025  3,240 March 28, 2026  5,775 June 27, 2026  6,718  0 1.4K 2.8K 4.2K 5.6K 7K   SOURCE AMD, second quarter 2026 results, August 2026    View the data| Quarter ended | Data Center revenue ($ millions) |
|---|---|
| June 28, 2025 | 3,240 |
| March 28, 2026 | 5,775 |
| June 27, 2026 | 6,718 |





## NVIDIA vs AMD Data Center Revenue

- NVIDIA accounted for about **93%** of the two companies’ combined Data Center revenue in their latest reported quarters.
- NVIDIA’s Data Center revenue grew **18%** from the previous quarter, while AMD’s Data Center segment grew **16.3%** from its previous quarter.
- NVIDIA’s Data Center revenue rose **42.9%** between the quarter ended January 25, 2026 and the quarter ended July 26, 2026.
- The cloud operators buying these chips report their server and [data center](/data-center-statistics/) budgets, compiled in [hyperscaler AI capex figures](/ai-capex-statistics/).

| Company | Segment | Quarter ended | Revenue ($ billions) | Change from a year ago (%) |
|---|---|---|---|---|
| NVIDIA | Data Center | July 26, 2026 | 89.0 | 117 |
| NVIDIA | Data Center | January 25, 2026 | 62.3 | 75 |
| AMD | Data Center (EPYC CPUs and Instinct GPUs) | June 27, 2026 | 6.7 | 107 |

*Source: NVIDIA and AMD earnings releases, 2026*

> **Key finding:** NVIDIA’s filing puts quarterly Data Center revenue at **$89.0 billion**, up **117%** from a year ago, while AMD’s Data Center segment, which also sells EPYC processors, reported **$6.7 billion**. Neither company states a GPU market share, so filed revenue is the open yardstick, read with different quarter ends and segment scopes.

### What is AMD’s share of the data center GPU market?

Neither company’s earnings release states one. AMD’s **$6.7 billion** Data Center segment equals about **7%** of the two companies’ combined Data Center revenue in their latest quarters. That split includes AMD’s EPYC CPUs and NVIDIA’s whole Data Center platform, so it is a revenue share, not a GPU unit share.

## Discrete GPU (AIB) Shipments by Quarter

- JPR counted **12.5 million** AIBs shipped worldwide in Q2 2026, up **10.0%** from the previous quarter and **6.6%** year over year.
- JPR’s Q1 2026 release put AIB shipments at **11.82 million**, down **0.6%** from a revised fourth quarter. Its Q4 2025 release had first reported **11.48 million**, so the chart below, which shows first-reported figures, rises from Q4 to Q1 even though JPR reported a decline.
- Fourth-quarter 2025 AIB shipments were up **36.0%** from a year earlier.
- JPR said that quarter’s shipments were down from the previous quarter, which it thinks was due to rising prices attributed to memory costs and tariffs.
- NVIDIA’s Gaming revenue rose **41%** to **$16.0 billion** for fiscal 2026, with **$3.7 billion** of it in the fourth quarter.
- JPR forecasts a compound annual growth rate of **-2.5%** for AIBs from 2025 to 2030, with an installed base of **193 million** units at the end of the period.
- Its Q1 2026 release forecast **-3.3%** a year from 2024 to 2029, and its Q4 2025 release **-5.9%** a year from 2024 to 2028.
- Dr. Jon Peddie, president of JPR, said that, “Defying common wisdom, high-end AIB sales spiked as prices increased.”

 AIB SHIPMENTS · Source: Jon Peddie Research AIB reports, Q4 2025 to Q2 2026   AIB SHIPMENTS    Jon Peddie · Q4 2025 AIB Shipments as First Reported (millions)          16 12 8 4 0   11.48 Q4 2025  11.82 Q1 2026  12.5 Q2 2026    SOURCE Jon Peddie Research AIB reports, Q4 2025 to Q2 2026    View the data| Quarter | AIB shipments (millions) |
|---|---|
| Q4 2025 | 11.48 |
| Q1 2026 | 11.82 |
| Q2 2026 | 12.5 |





## Desktop GPU Attach Rate

- The AIB attach rate in desktop PCs rose to **89%** in Q2 2026, up **23%** from the previous quarter, after a **33.2%** rise in Q1 2026 and a **12.3%** fall in Q4 2025.
- The desktop PC CPU market decreased **33%** year to year and **10.5%** quarter to quarter.
- Desktop PC CPU shipments decreased to **14 million** units in Q2 2026.
- JPR counted **75.5 million** PC GPUs in Q2 2026, up **10.4%** quarter to quarter and **1.1%** year over year, for a total attach rate of **120%** across integrated and discrete GPUs. A rate above 100% means more GPUs shipped than PCs, since one PC can carry both kinds.
- Desktop graphics decreased **4%** quarter to quarter while notebooks increased **16.8%**.
- Discrete GPUs increased **12.2%** in the quarter, according to Dr. Jon Peddie, against **10.0%** for AIBs, because JPR’s GPU count covers desktops, notebooks, and workstations while AIBs are add-in boards only.
- JPR expects the penetration of AIBs in desktop PCs to be **130%** over the next five years.
- JPR revises earlier quarters, so the chart below shows each release’s first-reported attach rate, and the quarter-over-quarter changes above do not match the chart’s figures.

 ATTACH RATE · Source: Jon Peddie Research AIB reports, Q4 2025 to Q2 2026   ATTACH RATE    Jon Peddie · Q4 2025 AIB Attach Rate in Desktop PCs as First Reported (%)          100 75 50 25 0   55% Q4 2025  76% Q1 2026  89% Q2 2026    SOURCE Jon Peddie Research AIB reports, Q4 2025 to Q2 2026    View the data| Quarter | Attach rate (%) |
|---|---|
| Q4 2025 | 55 |
| Q1 2026 | 76 |
| Q2 2026 | 89 |





## NVIDIA, AMD and Intel Discrete GPU Share Changes

- In Q4 2025, NVIDIA’s AIB market share increased by **1.6%** from the previous quarter, while AMD’s decreased by **1.6%**.
- In Q2 2026, NVIDIA’s AIB share decreased by **0.1%** and Intel’s increased by **0.3%**.
- Across all PC GPUs, including integrated, AMD’s share increased by **0.6%** in Q2 2026 and Intel’s decreased by **1.0%**.

| Quarter and measure | AMD (change) | Intel (change) | NVIDIA (change) |
|---|---|---|---|
| Q4 2025, AIB | -1.6% | flat | +1.6% |
| Q1 2026, AIB | -0.04% | +0.4% | -0.4% |
| Q2 2026, AIB | -0.16% | +0.3% | -0.1% |
| Q2 2026, all PC GPUs | +0.6% | -1.0% | +0.46% |

*Source: Jon Peddie Research AIB reports, Q4 2025 to Q2 2026, and Jon Peddie Research Market Watch report, Q2 2026*

> **Worth noting:** Jon Peddie Research’s Q2 2026 release gives AIB share as quarter-over-quarter changes, such as NVIDIA’s **0.1%** decrease, and points to a chart for the levels. A change of a fraction of a point says which way share moved, not how large each vendor’s share is, so these figures cannot be turned into a ranking by size.

## Most Used GPUs on Steam

- The NVIDIA GeForce RTX 5070 accounted for **6.15%** of all video cards in Steam’s September 2026 survey, up **2.38** points from August 2026.
- The RTX 5060 Ti rose **1.51** points to **4.06%**, and the RTX 5060 rose **1.24** points to **4.40%**.
- The RTX 3060 slipped **0.26** points to **3.66%**, and the RTX 4060 Laptop GPU **0.34** points to **3.50%**.
- The RTX 5070, RTX 5060 and RTX 5060 Ti together held **14.61%** of Steam survey cards in September 2026.
- The RTX 5070’s share rose **3.06 points** from **3.09%** in May 2026.

 SHARE OF STEAM SURVEY CARDS · Source: Valve, Steam Hardware &amp; Software Survey, September 2026   SHARE OF STEAM SURVEY CARDS    Valve · 2026 GPU Share on Steam by Card, September 2026 (%)         NVIDIA GeForce RTX 5070  6.15% NVIDIA GeForce RTX 5060  4.40% NVIDIA GeForce RTX 5060 Ti  4.06% NVIDIA GeForce RTX 4060  3.89% NVIDIA GeForce RTX 3060  3.66% NVIDIA GeForce RTX 4060 Laptop GPU  3.50% NVIDIA GeForce RTX 3050  2.90% NVIDIA GeForce RTX 4060 Ti  2.85%  0 1.4 2.8 4.2 5.6 7   SOURCE Valve, Steam Hardware &amp; Software Survey, September 2026    View the data| Video card | Share of Steam survey cards (%) |
|---|---|
| NVIDIA GeForce RTX 5070 | 6.15 |
| NVIDIA GeForce RTX 5060 | 4.40 |
| NVIDIA GeForce RTX 5060 Ti | 4.06 |
| NVIDIA GeForce RTX 4060 | 3.89 |
| NVIDIA GeForce RTX 3060 | 3.66 |
| NVIDIA GeForce RTX 4060 Laptop GPU | 3.50 |
| NVIDIA GeForce RTX 3050 | 2.90 |
| NVIDIA GeForce RTX 4060 Ti | 2.85 |





### Which GPU has the highest market share?

The NVIDIA GeForce RTX 5070 topped Steam’s September 2026 card table at **6.15%** of survey participants’ video cards. By maker, NVIDIA held **75.97%** of Steam video card usage and **55.8%** in PassMark’s 30-day count. Both are installed-base samples, not sales, so the leader by units shipped can differ.

### What are the top 5 GPUs?

In Steam’s September 2026 survey, the first five cards in the all-video-cards table, ordered by share, were the GeForce RTX 5070 (**6.15%**), RTX 5060 (**4.40%**), RTX 5060 Ti (**4.06%**), RTX 4060 (**3.89%**), and RTX 3060 (**3.66%**). All five are NVIDIA cards, and the ranking reflects Steam users who answered the survey, not cards sold.

## Supercomputer GPU Share (TOP500)

- **276** systems on the June 2026 TOP500 list use accelerator or co-processor technology, up from **255** six months earlier.
- That is **55.2%** of the list’s **500** systems.
- NVIDIA Hopper chips power **107** of the accelerated systems, about **3.3** for every system using AMD Instinct.
- NVIDIA Ampere chips power another **62**, so **169** of the **276** accelerated systems use NVIDIA Hopper or Ampere chips.
- The NVIDIA H200 SXM5 141 GB and the NVIDIA H100 SXM5 80 GB each appear in **26** systems, **5.2%** of the list.
- AMD’s Instinct MI250X and Instinct MI300A each appear in **13** systems.
- Host processors are counted separately from accelerators: Intel provides the processors for the largest share of TOP500 systems, **53.20%**, down from **57.00%** six months ago, while **192** systems (**38.40%**) use AMD processors.

 SYSTEMS ON THE JUNE 2026 LIST · Source: TOP500, June 2026 list highlights   SYSTEMS ON THE JUNE 2026 LIST    TOP500 · 2026 Accelerated TOP500 Systems by Chip Family (systems)         NVIDIA Hopper  107 NVIDIA Ampere  62 AMD Instinct  32  0 30 60 90 120 150   SOURCE TOP500, June 2026 list highlights    View the data| Accelerator family | Systems on the June 2026 list |
|---|---|
| NVIDIA Hopper | 107 |
| NVIDIA Ampere | 62 |
| AMD Instinct | 32 |





The model table below lists the top ten accelerator models.

| Accelerator model | Systems | Share of list (%) |
|---|---|---|
| NVIDIA H200 SXM5 141 GB | 26 | 5.2 |
| NVIDIA H100 SXM5 80 GB | 26 | 5.2 |
| NVIDIA A100 | 23 | 4.6 |
| NVIDIA GH200 Superchip | 21 | 4.2 |
| NVIDIA H100 | 17 | 3.4 |
| NVIDIA A100 SXM4 40 GB | 14 | 2.8 |
| NVIDIA H100 SXM5 94 GB | 14 | 2.8 |
| NVIDIA Tesla V100 | 13 | 2.6 |
| AMD Instinct MI250X | 13 | 2.6 |
| AMD Instinct MI300A | 13 | 2.6 |

*Source: TOP500, June 2026 list statistics*

## H100 Price per Hour

- Lambda lists the NVIDIA H100 SXM with **80 GB** of memory at **$3.99** per GPU per hour on its 8x self-serve instances.
- On the same price list, the NVIDIA A100 SXM with **80 GB** costs **$2.79** and the Tesla V100 **$0.79** per GPU per hour.
- Lambda prices H100 clusters of **16** GPUs at **$6.16** per GPU per hour on terms of 2 weeks to 1 year, with lower rates at **64** and **256** GPUs.
- CoreWeave’s **$49.24** hourly on-demand price for an 8-GPU HGX H100 node works out to about **$6.16** per GPU-hour, one of the hardware costs behind AI inference prices per token.
- Lambda’s 16-GPU cluster rate is about **1.54 times** its self-serve instance rate.

 PRICE PER GPU-HOUR ($) · Source: Lambda pricing page, October 2026   PRICE PER GPU-HOUR ($)    Lambda · 2026 Lambda H100 Price by Offer ($ per GPU-hour)         8x instance, self-serve  $3.99 16-GPU cluster  $6.16 64-GPU cluster  $5.85 256-GPU cluster  $5.54  0 1.4 2.8 4.2 5.6 7   SOURCE Lambda pricing page, October 2026    View the data| Lambda H100 offer | Price per GPU-hour ($) |
|---|---|
| 8x instance, self-serve | 3.99 |
| 16-GPU cluster | 6.16 |
| 64-GPU cluster | 5.85 |
| 256-GPU cluster | 5.54 |





## H200 and B200 Rental Prices

- [Cloud computing](/cloud-computing-statistics/) provider CoreWeave lists an 8-GPU NVIDIA HGX B200 node at **$68.80** per hour on-demand and **$34.11** per hour on spot.
- That is about **$8.60** per B200 GPU-hour on-demand, against Lambda’s **$6.69** per GPU per hour for the B200 SXM6.
- CoreWeave’s HGX H200 node works out to about **$6.31** per GPU-hour on-demand.
- An H200 node costs **$1.20** an hour more than an H100 node on-demand.
- B200 spot capacity costs **49.6%** of the on-demand rate, against about **40%** for the H100.

 On-demand vs Spot · Source: CoreWeave pricing page, October 2026      CoreWeave · 2026 CoreWeave 8-GPU Node Prices ($ per hour) On-demand vs Spot    On-demand  Spot          70 56 42 28 14 0   49.24  19.71  50.44  20.93  68.8  34.11   HGX H100 HGX H200 HGX B200  On-demand · 49.24 Spot · 19.71 On-demand · 50.44 Spot · 20.93 On-demand · 68.8 Spot · 34.11   SOURCE CoreWeave pricing page, October 2026    View the data| Node (8 GPUs) | On-demand ($ per hour) | Spot ($ per hour) |
|---|---|---|
| HGX H100 | 49.24 | 19.71 |
| HGX H200 | 50.44 | 20.93 |
| HGX B200 | 68.80 | 34.11 |







> **By the numbers:** CoreWeave charges **$49.24** an hour for an 8-GPU HGX H100 node, **$50.44** for an HGX H200 node and **$68.80** for an HGX B200 node on-demand. The B200 node costs about **1.4 times** the H100 node, so the newer chip’s premium shows in list prices before any performance comparison.

## Cloud GPU Price Cuts

- AWS cut On-Demand prices for P5 instances with NVIDIA H100 GPUs by **44%** from May 31, 2025 baseline prices.
- For P5, reductions under Savings Plans reached **45%**.
- The reductions applied to On-Demand purchases beginning June 1, 2025, and to Savings Plan purchases effective after June 4, 2025.
- AWS’s own standing among cloud providers is measured in cloud provider market share.

 ON-DEMAND PRICE REDUCTION · Source: Amazon Web Services, June 2025   ON-DEMAND PRICE REDUCTION    Amazon Web Services · 2025 AWS GPU Instance On-Demand Price Cuts (%)         P5 (H100)  44% P4d (A100)  33% P4de (A100)  33% P5en (H200)  25%  0 10 20 30 40 50   SOURCE Amazon Web Services, June 2025    View the data| Instance (GPU) | On-Demand price reduction (%) |
|---|---|
| P5 (H100) | 44 |
| P4d (A100) | 33 |
| P4de (A100) | 33 |
| P5en (H200) | 25 |





## What is NVIDIA’s GPU market share?

NVIDIA held **75.97%** of video card usage among Steam survey participants in September 2026 and **55.8%** of cards in use in PassMark’s 30-day count. In data centers, it reported **$89.0 billion** of Data Center revenue for the quarter ended July 26, 2026. Jon Peddie Research’s release text gives NVIDIA’s add-in board share as quarterly changes.

## How much does an H100 cost per hour?

Lambda lists the NVIDIA H100 SXM at **$3.99** per GPU per hour on self-serve instances, and its H100 clusters run **$5.54** to **$6.16** per GPU per hour. CoreWeave charges **$49.24** an hour on-demand for an 8-GPU HGX H100 node, or **$19.71** on spot. These are list rates as of October 13, 2026.

## Conclusion

NVIDIA’s **75.97%** of Steam survey video cards in September 2026 and its **$89.0 billion** of Data Center revenue in the quarter ended July 26, 2026 put it ahead on every GPU market share measure here that reports a level, though PassMark’s lower count shows how much the answer depends on the sample. NVIDIA expects third-quarter fiscal 2027 revenue of **$108.0 billion**, plus or minus **2%**, and Jon Peddie Research forecasts a compound annual growth rate of **-2.5%** for AIBs from 2025 to 2030.